If you’ve been following this story, you know that we’re striving to gather the funding to finish construction on the little house you see pictured above, so that our friends Aji and Wings don’t have to spend another winter in the rusty old RV they’ve been living in for six years, since their original manufactured house was repossessed. The adobe first floor is built, and the frame second floor is being added now. By a week from now, the next step will be putting the roof on.
The good part is, once the roof goes on, it’s much easier for work like plumbing and wiring and interior walls to continue even if the weather gets bad. The bad part is, once they get to the point of being ready for the roof, nothing else can happen until that’s done. And the roof materials cost $5300. BUT THERE IS GOOD NEWS BELOW THE FOLD!!!